Combined Cycle Gas Turbine’s Performance
Introduction:
The addition
of gas turbine-based combined cycle power plants to supply new generating
capacity continues to play a major role in the power industry. This
technology is being adopted by all key players in the power industry because it
offers high thermal efficiency, low emissions, low installed cost, flexibility
in fuel selection, low operation and maintenance cost, short installation time,
and high operating flexibility. A successful approach to providing technical
services and engineering support is to address the operational and maintenance
aspects involving the integrated functioning of the two thermodynamic cycles in
a combined cycle power plant. The staff must understand the
interrelationships between the combined cycle plant components and systems to
efficiently operate the plant.
The candidates
will be able to explain the effect of operating parameters such as firing
temperatures, compressor pressure ratios, ambient temperature and pressure
conditions, turbine exhaust temperatures and their effect on gas turbine
efficiency/power output, and the combined cycle efficiency/power output. This
course goes through the overview of a combined cycle gas turbine; this will be
followed by the different types of Gas Turbine. This is then expanded on to
give a detailed understanding of the performance and management of the
operations of a combined cycle gas turbine.
Course
Objectives:
By the end of
this course delegates will be able to:
· Obtain an understanding of the performance of a
Combined Cycle Gas Turbine
· Identify the different types of Combined Cycle
Gas Turbine, Gas Turbine Performance and Power Plant Operation
Who
Should Attend?
Electrical Engineers, Power Generation
Engineers, Power System Protection Engineers, Gas turbine newcomers and more
experienced persons who desire an overview of the many available gas turbine
technologies, Process Control Engineers & Personnel, Electrical and
Instrumentation Technicians & Design Engineers, Maintenance Technicians
& Supervisors, Plant Operators & Technicians, Oil & Gas Industry
Personnel
Course
Outline:
Combined Cycle GT Plant Overview
· Gas Turbine ( Frame 9e, 13E2)
· Steam Turbine
· Boiler Components
Performance Theory
· Brayton Cycle
· Rankine Cycle
· Combined Cycle
Performance Terms and Definitions
· Units and Terminology, Conversion factors
· Power Output (Gross and Net)
· Heat Rate (Gross and Net)
· Energy inputs
· Efficiency
· System Losses
Correction Factors
· Test Reference conditions
· Pressure
· Temperature
· Humidity
· Power factor
· Altitude
· Pressure Drops
· Boiler steam flow
· Condenser vacuum
· Frequency
Gas Turbine Performance
· Test Procedure
· Instrumentation Required
· Performance Data Collection
· Performance Calculations
· Using Correction Factors
Steam Turbine & Boiler
Performance
· Test Procedure
· Instrumentation Required
· Performance Calculations
· Supplementary Firing Considerations
CCGT Plant Performance
· Test Procedure
· Instrumentation Required
· Performance Data Collection
· Performance Calculations
· Overall Plant Efficiency
· Practical Examples of Performance Calculations
Performance Diagnostics
· Identifying lost performance
· Locating the cause
· Remedial action
Performance Improvement Methods
· Increase Mass Flow (steam, water injection)
· Chillers
· Increase Firing Temperature (Component Upgrade Options)
· Reducing Leakage and Improving Cooling
Code | From | To | City | Fee | |
---|---|---|---|---|---|
PG03 | 06 Jan 2020 | 17 Jan 2020 | Istanbul | US$ 7500 | Book |
PG03 | 01 Mar 2020 | 12 Mar 2020 | Dubai | US$ 7000 | Book |
PG03 | 03 May 2020 | 14 May 2020 | Cairo | US$ 6500 | Book |
PG03 | 06 Jul 2020 | 17 Jul 2020 | Kuala Lumpur | US$ 7500 | Book |
PG03 | 14 Sep 2020 | 25 Sep 2020 | London | US$ 8000 | Book |
PG03 | 02 Nov 2020 | 13 Nov 2020 | California | US$ 9000 | Book |
DUBAI OFFICE
Ittihad Deira Building, |
USA OFFICE 642 E14 Street,10009-13 Manhattan, New York (NY) USA info@petrogas-training.com |
EGYPT OFFICE 52 General Kamal Hejab Street,Suez Bridge, Cairo, Egypt info@petrogas-training.com |
Certificate of Completion will be provided to the candidate(s) who successfully attend and complete the course. Training hours attendance percentage of 75% is required.
Standard course hours: 8:30 A.M. to 3:30 P.M. Informal discussions: 4:30 P.M. to 5:30 P.M.
We use a blend of interactive and hands-on methods, active participation, a variety of instructional techniques, dynamic presentations, individual and group exercises, in depth discussion, DVD’s, role-plays, case studies, examples. All of the information, competencies, knowledge and skills acquired within our training programs, are 100% transferrable to the participants’ workplace.
Pre-Test and Post-Test Assessment are applied on 5-day and 10-day programs. Also, post course evaluation and candidate’s evaluation are applied to add another level of quality measurement. Candidates’ feedback is highly appreciated to elevate the training service quality.
A- Have staff trained in the latest training and development approaches
B- Support nationalization and talent management initiatives
C- Have properly trained and informed people who will be able to add value
D- Gain relevant technical knowledge, skills and competencies
A- Develop job related skills
B- Develop personal skills in subject matter
C- Have a record of your growth and learning results
D- Bring proof of your progress back to your organization
F- Become competent, effective and productive
G- Be more able to make sound decisions
H- Be more effective in day to day work by mastering job-related processes
I- Create and develop competency to perform job well
A- 10% discount after 05 candidates’ registration.
B- 15% discount after 10 candidates’ registration.
C- 20% discount after 20 candidates’ registration.
D- 25% discount after 25 candidates’ registration.
E- 30% discount after 30 candidates’ registration
F- Higher discount rates will be offered based on work volume with different clients.
A- One extra free seat is offered on 4 candidates on the same course and dates.
B- Two extra free seats are offered on 6 candidates on the same course and dates.
C- Three extra free seats are offered on 8 candidates on the same course and dates.
D- Four extra free seats are offered on 10 candidates on the same course and dates.
E- Five extra free seats are offered on 12 candidates on the same course and dates.
Nominations to our public courses are to be processed by the client’s Training and/or HR departments. A refund will be issued back to the client in the event of course cancellation or seat unavailability. A confirmation will be issued to the relevant department official(s).
If a confirmed registration is cancelled less than 5 working days prior to the course start date, a substitute participant may be nominated to attend the same course or a 20% cancellation charge is applied. In case of a no-show, a 100% fee will be charged.
PAYMENT POLICY
Payment is due upon receiving the course confirmation, invoice and/or proforma invoice. However; the fee due can be wire transferred to our bank account directly after course completion. Our bank details are illustrated on the confirmation, invoice and proforma invoice, as well. The above documents can be communicated electronically, i.e., in a soft copy or/and in hard copy based on customer’s request.
COPYRIGHT
© 2017. Material published by PETROGAS shown here is copyrighted. © 2017. All rights reserved. Any unauthorized copying, distribution, use, dissemination, downloading, storing in any medium, transmission, reproduction or reliance in whole or any part of this course outline is prohibited and will constitute an infringement of copyright.